The Kitchen Remodel Timeline, Step by Step

The Kitchen Remodel Timeline, Step by Step

A kitchen remodel feels far less daunting when you know the path. Here's how a typical project flows from first idea to final reveal.

1. Consultation and design

We learn how you live and cook, take measurements, and design the space with you — cabinetry, stone, tile and fixtures — so you can see it before anything is ordered. This stage sets up everything that follows.

2. Selections and ordering

You finalize finishes and materials, and custom cabinetry and countertops go into production. Because these are made to order, this stage takes some lead time — well worth it for a result built to your space.

3. Demolition and prep

Out with the old. Any behind-the-wall work — plumbing, electrical, framing — happens now, while everything is accessible.

4. Installation

Cabinetry goes in, countertops are templated and installed, then backsplash, fixtures and hardware. The kitchen comes together quickly at this stage.

5. The reveal

Final details, a walk-through, and the moment you've been picturing. Throughout, we keep you posted so there are no surprises — just the kitchen you planned.